Construction

Dowida Properties thinks first about its executing project construction, and then we work backwards by formulating how to get all the materials to different sites. After this, we determine how and where engineering should drive. The basic elements of Dowida Properties in construction include- implementation of the best practices implementation along with the aspects of material management, construction technologies, HSE, construction in plain and labour.

Look at the design and sequencing of procurement sequencing to support the construction work. Enhance the preassembly on and off-site wherever applicable. Integrating the methodologies of construction and execution throughout the life cycle of the project is one of our major elements. Provide proactive and early and doable construction plans and reviews regarding constructability. We assure engineering and construction take place smoothly from process development and optimization-driven explained as the study phases, to the construction and start-up driven execution defined by the EPC phase.